Budding Engineers Build Bridge in 24-Hours
Doesn’t it seem like Dallas roads are perpetually under construction? Perhaps the solution to speedy projects lies with the city’s youth. A dozen students from DISD, Hockaday, Ursuline, and Greenhill constructed a 20-foot model of the Margaret Hunt Hill Bridge in just one day.
If you don’t believe me, the entire thing was caught on film by producer Judy Kelly.”Calatrava Student Constructors Documentary: An Engineering Workshop,” will be screened 7 p.m. Friday at Simmons Hall on the SMU campus.